quality

We can provide full traceability on all our projects

All fabrication materials are inspected as they arrive at our premises. We ensure all materials are labelled before issue. Welding consumables are stored in a dedicated area, with a log and material certification unique to that product. PMI certification is carried out when required, to back up any factory issued documentation.

A dedicated CSWIP registered welding inspector controls all welding operations in our workshop – from unique welder identification, to a full electronic documentation package, we can provide full traceability on all our projects.

© Copyright Tulway Engineering Ltd 2015
Web Design Manchester by Bamboo