service-photo

Quality Pipework Fabrication

Weld reports for each individual pipe spool are generated through our quality control system, and passed by off by registered CSWIP inspectors.

All welding procedures and welder qualifications are compiled by recognised third party organisations. We can offer job specific qualifications to any standard within a very short timeframe and recognise the requirement for full traceability of materials – from order to installation.

Pressure testing facilities are available up to 10,000 P.S.I. complete with fully
calibrated equipment. Testing to these pressures can be carried out using water, inert gases or compressed air. Third party witnessing can also be arranged if required.

ISO 9001:2015 ACCREDITATION

ISO 9001 2015 CERTIFCATION We are pleased to announce that Tulway have now achieved accreditation to ISO 9001:2105 for our Management Systems.Read More >

Tulway Achieve BS EN 1090-1 Accreditation

We are pleased to announce that we have achieved BS EN 1090-1 accreditation for CE marking of structural steelwork & associated components at the first attempt. We would like toRead More >

The World's Largest Cold Energy Storage Plant.

On completion of the mechanical contract, Tulway would like to wish Highview Power Storage every success with this new technology: http://www.bbc.co.uk/news/science-environment-37902773Read More >
© Copyright Tulway Engineering Ltd 2015
Web Design Manchester by Bamboo