client-2

‘We recently chose Tulway Engineering as a supplier for a pressure test loop we had designed. From day one, we experienced a very professional and helpful service form Tulway. They helped advise on the design aspects, and they were always at hand to answer any questions we had. The final components supplied were of a very high standard, as was the overall level of service. Tulway went out of their way to ensure the project kept to the tight deadlines agreed, and I would highly recommend them to anyone. We will certainly be using them again.’

Pete Lomas (Design Manager @ C-Tech Innovation)


client-5

‘As a top tier COMAH site, our engineering must comply with the highest standards and stand up to the closest scrutiny in all aspects of design, implementation, compliance and reliability. Tulway Engineering have been our partner for many years and have always impressed with the quality of their work. Additionally, their flexibility and commitment has been an important factor, often working long hours to suit our production needs while always maintaining cost competitiveness.’

Mike Holding (Managing Director @ Contract Chemicals (Knowsley) Ltd)


client-3

‘Tulway Engineering Ltd have proved to provide an excellent and reliable service, efficient turnaround and quality workmanship. Many thanks for your professional approach and we rely on your cooperation for the future.’

Graham Travis (Project Manager @ Tyco Fire & Integrated Solutions, Aberdeen)


client-4

‘Tulway Engineering have completed a number of project and maintenance activities safely and efficiently on our site. They have demonstrated very good work preparation and execution and the nature of the work that we have given them, has demonstrated their flexibility and focus on achieving agreed targets, i.e. safety, standards, time and cost.’

Paul Littlefield (Project Manager @ Lucite International (UK) Ltd, Darwen)


client-1

‘Tulway Engineering Ltd have provided engineering project and maintenance services for several years at our Whitchurch site, the standard of their work has been excellent at all times and their support has often enabled our own on-site engineering team to save time and money. At our Whitchurch site, we aim to achieve the highest health, safety and environmental standards and I am pleased to say that Tulway Engineering Ltd have all met and often exceeded our requirements in this area, with high quality risk assessments provided for all works. Overall Tulway Engineering Ltd have provided us with an excellent service, often at very short notice and I would have no hesitation in recommending Tulway Engineering Ltd to others.’

Adrian Platt (Managing Director @ Befesa Salt Slags Limited)

Tulway Achieve BS EN 1090-1 Accreditation

We are pleased to announce that we have achieved BS EN 1090-1 accreditation for CE marking of structural steelwork & associated components at the first attempt. We would like toRead More >

The World's Largest Cold Energy Storage Plant.

On completion of the mechanical contract, Tulway would like to wish Highview Power Storage every success with this new technology: http://www.bbc.co.uk/news/science-environment-37902773Read More >

New PED Regulations (2014/68/EU)

The Pressure Equipment Directive (97/23/EC) is due to be replaced by a brand new Directive that has been aligned to the New Legislative Framework. The arrival of the new DirectiveRead More >
© Copyright Tulway Engineering Ltd 2015
Web Design Manchester by Bamboo